OIL AND GAS REPORT

The Arkansas Oil and Gas Commission last week issued 0 drilling permits, 0 well completions and 6 well recompletions. By county, they were:

WELL RECOMPLETIONS

CLEBURNE — BHP Billiton Petroleum (Fay) of Houston for Bobbie Dudeck No. 11-10 1-18H7, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 7,375 ft., perf. 2,729-7,274 OA ft. Loc. SHL: 1,028 ft. FSL & 1,460 ft. FWL and BHL: 544 ft. FSL & 589 ft. FWL of Sec. 18-11N-10W. Workover done March 17.

XTO Energy Inc. of Oklahoma City for Green Bay No. 2-8H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,234 ft., perf. 4,142-8,072 OA ft. Loc. SHL: 294 ft. FSL & 2,024 ft. FEL and BHL: 589 ft. FNL & 1,326 ft. FEL of Sec. 8-10N-11W. Workover done March 30.

FAULKNER — XTO Energy Inc. for Freeman No. 1-8H5, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 11,469 ft., perf. 8,750-11,242 OA ft. Loc. SHL: 1,100 ft. FNL & 800 ft. FEL and BHL: 2,552 ft. FSL & 1,895 ft. FWL of Sec. 8-7N-12W. Workover done March 28.

WHITE — BHP Billiton Petroleum (Fay) for Ballard No. 7-9 1-13H12, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,584 ft., perf. 6,060-10,480 OA ft. Loc. SHL: 300 ft. FSL & 860 ft. FEL and BHL: 98 ft. FSL & 577 ft. FEL of Sec. 13-7N-9W. Workover done March 21.

BHP Billiton Petroleum (Fay) for Castera No. 7-9 2-7H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,561 ft., perf. 6,962-10,460 OA ft. Loc. SHL: 336 ft. FSL & 583 ft. FWL and BHL: 1,113 ft. FNL & 1,172 ft. FWL of Sec. 7-7N-9W. Workover done March 22.

BHP Billiton Petroleum (Fay) for Chief No. 8-7 3-16H8, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 11,061 ft., perf. 4,961-10,958 OA ft. Loc. SHL: 263 ft. FSL & 507 ft. FWL and BHL: 638 ft. FSL & 2,347 ft. FEL of Sec. 16-8N-7W. Workover done March 23.

ABBREVIATIONS

Loc. — location; Perf. — perforations; FEL — from the east line; FNL — from the north line; FSL — from the south line; FWL — from the west line; FEUL — from the east unit line; FWUL — from the west unit line; FNUL — from the north unit line; FSUL — from the south unit line; MCF — thousand cubic feet; bbl — barrel; MD — measured depth; TD — total depth; TVD — true vertical depth; PBTD — plug back total depth; BHL — bottom hole location; PBHL — proposed bottom hole location; SHL — surface hole location; OA — overall; N/A — not available.