OIL AND GAS REPORT

The Arkansas Oil and Gas Commission last week issued 3 drilling permits, 1 well completions, and 3 well recompletions. By county, they were:

DRILLING PERMITS

COLUMBIA — Munoco Co. L.C. of El Dorado for Rasberry No. 1 to TVD: 5,700 ft. and MD: 5,700 ft. in Pettet Form. of Chalybeat Springs Fld. Loc. SHL: 500 ft. FEL & 1,700 ft. FSL of Sec. 33-19S-19W. Contractor: Sewell Drilling Co. LLC; work began July 11.

OUACHITA — Langley, Jerry Oil Co. LLC of Smackover for Deltic No. 2 to TVD: 3,000 ft. and MD: 3,000 ft. in Blossom Form. of Smackover Fld. Loc. SHL: 2,400 ft. FNL & 280 ft. FWL of Sec. 36-15S-17W. Contractor: Sewell Drilling Co. LLC; work began Aug. 3.

UNION — Great Lakes Chemical Corp of El Dorado for Lanxess No. 1 to TVD: 8,950 ft. and MD: 8,950 ft. in Smackover Form. of Wildcat Fld. Loc. SHL: 2,014 ft. FSL & 2,542 ft. FEL of Sec. 29-19S-15W. Contractor: Reliance Well Service; already drilled.

WELL COMPLETIONS

COLUMBIA — Betsy Production Co. Inc. of Magnolia for B Gunnels No. 1, 24-hr. prod. not available in Dry Hole Form. of Village Fld. Drilled to TD: 7,225 ft., perf. not available ft. Loc. 987 ft. FSL & 2,068 ft. FWL of Sec. 14-17S-19W. Completed June 30.

WELL RECOMPLETIONS

CONWAY — Seeco LLC. of Spring for Green Bay Packaging No. 09-15 3-18H19, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,636 ft., perf. 4,220-8,524 OA ft. Loc. SHL: 761 ft. FSL & 976 ft. FWL and BHL: 4,155 ft. FNL & 1,556 ft. FWL of Sec. 18-9N-15W. Workover done April 19.

Seeco LLC. for James Guinn No. 09-15 7-25H24, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,922 ft., perf. 4,270-9,810 OA ft. Loc. SHL: 1,495 ft. FNL & 1,613 ft. FEL and BHL: 494 ft. FNL & 1,834 ft. FEL of Sec. 25-9N-15W. Workover done May 9.

Seeco LLC. for Ralph Bryant No. 09-14 11-16H21, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,276 ft., perf. 4,185-8,182 OA ft. Loc. SHL: 791 ft. FSL & 2,347 ft. FEL and BHL: 1,682 ft. FSL & 1,976 ft. FWL of Sec. 16-9N-14W. Workover done March 20, 2014.

ABBREVIATIONS

Loc. — location; Perf. — perforations; FEL — from the east line; FNL — from the north line; FSL — from the south line; FWL — from the west line; FEUL — from the east unit line; FWUL — from the west unit line; FNUL — from the north unit line; FSUL — from the south unit line; MCF — thousand cubic feet; bbl — barrel; MD — measured depth; TD — total depth; TVD — true vertical depth; PBTD — plug back total depth; BHL — bottom hole location; PBHL — proposed bottom hole location; SHL — surface hole location; OA — overall; N/A — not available.