OIL AND GAS REPORT

The Arkansas Oil and Gas Commission last week issued 0 drilling permits, 0 well completions and 6 well recompletions. By county, they were:

WELL RECOMPLETIONS

COLUMBIA -- Bonanza Creek Energy Resources LLC of Denver, CO for Willis-Jameson No. 4, 24-hr. prod. 0 bbls in Cotton Valley Form. of Dorcheat Maceodnia Fld. Drilled to TD: 8,825 ft., perf. 6,865-8,620 OA ft. of Sec. 20-18S-21W. workover done Feb. 15.

Bonanza Creek Energy Resources LLC for Willis-Jameson No. 6, 24-hr. prod. 8 bbls in Cotton Valley Form. of Dorcheat Macedonia Fld. Drilled to TD: 8,800 ft., perf. 6,767-8,733 OA ft. of Sec. 20-18S-21W. workover done Feb. 22.

FRANKLIN -- XTO Energy Inc. of Oklahoma City for Blanscet No. 4-27, 24-hr. prod. not available in Casey/Dunn A/Ralph Barton/Lower Hale Form. of Aetna Fld. Drilled to TD: 5,850 ft., perf. 3,911-5,722 OA ft. Loc. 1,700 ft. FNL & 2,600 ft. FWL of Sec. 27-9N-27W. Commingle done Feb. 23.

VAN BUREN -- SEECO LLC of Houston for Charles Hall No. 09-13 1-30H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,350 ft., perf. 4,569-6,763 OA ft. Loc. SHL: 612 ft. FSL & 616 ft. FWL and BHL: 4,792.6 ft. FSL & 907.2 ft. FWL of Sec. 30-9N-13W. Workover done Jan. 10.

WHITE -- BHP Billiton Petroleum (Fay) of Houston for Pennington No. 8-6 5-19H18, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 11,287 ft., perf. 5,947-11,177.5 OA ft. Loc. SHL: 219 ft. FSL & 1,985 ft. FEL and BHL: 637 ft. FSL & 2,131 ft. FWL of Sec. 19-8N-6W. Workover done Feb. 2.

BHP Billiton Petroleum (Fay) for Virginia Cobb No. 8-7 1-21H17, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 11,354 ft., perf. 5,323-11,253.5 OA ft. Loc. SHL: 200 ft. FSL & 1,490 ft. FWL and BHL: 438 ft. FSL & 1,770 ft. FEL of Sec. 21-8N-7W. Workover done Feb. 4.

ABBREVIATIONS

Loc. -- location; Perf. -- perforations; FEL -- from the east line; FNL -- from the north line; FSL -- from the south line; FWL -- from the west line; FEUL -- from the east unit line; FWUL -- from the west unit line; FNUL -- from the north unit line; FSUL -- from the south unit line; MCF -- thousand cubic feet; bbl -- barrel; MD -- measured depth; TD -- total depth; TVD -- true vertical depth; PBTD -- plug back total depth; BHL -- bottom hole location; PBHL -- proposed bottom hole location; SHL -- surface hole location; OA -- overall; N/A -- not available.

SundayMonday Business on 03/12/2017

Upcoming Events