OIL AND GAS REPORT

The Arkansas Oil and Gas Commission last week issued 2 drilling permits, 1 well completions and 9 well recompletions. By county, they were:

DRILLING PERMITS

UNION — Shamrock Well Operations LLC of Fort Smith for Weyerhaeuser No. 1-18 to TVD: 4,700 ft. and MD: 4,700 ft. in Travis Peak Form. of Wildcat Fld. Loc. SHL: 1,650 ft. FNL & 2,200 ft. FWL of Sec. 18-18S-13W. Contractor: Mike Rogers Drilling; work began Nov. 6.

Shamrock Well Operations LLC for Weyerhaeuser No. 1-19 to TVD: 4,700 ft. and MD: 4,700 ft. in Travis Peak Form. of Wildcat Fld. Loc. SHL: 330 ft. FNL & 1,960 ft. FEL of Sec. 19-18S-13W. Contractor: Mike Rogers Drilling; work began Nov. 6.

WELL COMPLETIONS

UNION — Quanico Oil & Gas Inc. of El Dorado for Crain No. 2, 24-hr. prod. 50 bbls in Smackover Limestone Form. of Champagnolle Fld. Drilled to TD: 5,800 ft., perf. 5,666-5,674 ft. Loc. 2,368 ft. FSL & 1,608 ft. FEL of Sec. 1-17S-14W. Completed Nov. 6.

WELL RECOMPLETIONS

COLUMBIA — Albemarle Corp. of Magnolia for White (BIW No. 57) 1, 24-hr. prod. not available in Smackover Form. of Warnock Springs Fld. Drilled to not available ft., perf. 8,070-8,340 OA ft. of Sec. 11-17S-20W. Workover done Oct. 9.

FRANKLIN — XTO Energy Inc. of Oklahoma City for Casalman No. 3-35, 24-hr. prod. not available in Dunn A/Orr Form. of Cecil Fld. Drilled to TD: 5,350 ft., perf. 3,918-4,614 OA ft. Loc. 1,420 ft. FNL & 900 ft. FEL of Sec. 35-9N-28W. Commingle done Nov. 2.

OUACHITA — Arkansas Production Services LLC for Bennett No. 18, 24-hr. prod. 3 bbls in Nacatoch Form. of Smackover Fld. Drilled to TD: 2,540 ft., perf. 1,952-1,960 OA ft. of Sec. 32-15S-15W. Workover done Oct. 20.

SEBASTIAN — Riverfront Exploration LLC of Fort Smith for Ruth Walker No. 7, 24-hr. prod. not available in Orr Form. of B-44 Fld. Drilled to TD: 9,030 ft., perf. 8,326-8,377 OA ft. Loc. 2,300 ft. FSL & 1,840 ft. FWL of Sec. 3-6N-31W. Re-instate done Oct. 30.

VAN BUREN — Seeco LLC. of Spring for Betty Trust Graddy No. 10-12 8-15H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,242 ft., perf. 3,693-8,147 OA ft. Loc. SHL: 1,130 ft. FNL & 58 ft. FEL and BHL: 1,542 ft. FNL & 282 ft. FWL of Sec. 15-10N-12W. Workover done Oct. 19.

WHITE — BHP Billiton Petroleum (Fay) of Houston for Kathie Lyle No. 8-6 1-1H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,830 ft., perf. 4,785-8,735 OA ft. Loc. SHL: 250 ft. FSL & 839 ft. FWL and BHL: 491 ft. FNL & 585 ft. FWL of Sec. 1-8N-6W. Workover done Oct. 24.

BHP Billiton Petroleum (Fay) for Reed No. 9-7 2-27H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,802 ft., perf. 4,425-8,697 OA ft. Loc. SHL: 370 ft. FSL & 1,945 ft. FEL and BHL: 492 ft. FNL & 768 ft. FWL of Sec. 27-9N-7W. Workover done Oct. 20.

BHP Billiton Petroleum (Fay) for Simpson No. 8-10 1-33H28, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,298 ft., perf. 6,450-9,582 OA ft. Loc. SHL: 2,204 ft. FNL & 1,821 ft. FEL and BHL: 1,526 ft. FSL & 1,236 ft. FWL of Sec. 33-8N-10W. Workover done Oct. 24.

BHP Billiton Petroleum (Fay) for Womack No. 9-7 2-4H, 24-hr. prod. not available in Fayettevlle Form. of B-43 Fld. Drilled to TD: 7,775 ft., perf. 4,646-7,526 OA ft. Loc. SHL: 1,200 ft. FNL & 300 ft. FWL and BHL: 738 ft. FSL & 2,307 ft. FWL of Sec. 4-9N-7W. Workover done Oct. 17.

ABBREVIATIONS

Loc. — location; Perf. — perforations; FEL — from the east line; FNL — from the north line; FSL — from the south line; FWL — from the west line; FEUL — from the east unit line; FWUL — from the west unit line; FNUL — from the north unit line; FSUL — from the south unit line; MCF — thousand cubic feet; bbl — barrel; MD — measured depth; TD — total depth; TVD — true vertical depth; PBTD — plug back total depth; BHL — bottom hole location; PBHL — proposed bottom hole location; SHL — surface hole location; OA — overall; N/A — not available.