OIL AND GAS REPORT

The Arkansas Oil and Gas Commission last week issued 0 drilling permits, 0 well completions and 4 well recompletions. By county, they were:

WELL RECOMPLETIONS

CLEBURNE -- BHP Billiton Petroleum (Fay) of Houston for Stanley Kennedy No. 9-11 1-27H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,062 ft., perf. 5,074-8,965 OA ft. Loc. SHL: 495 ft. FSL & 217 ft. FWL and BHL: 484 ft. FNL & 579 ft. FWL of Sec. 27-9N-11W. Workover done June 2.

BHP Billiton Petroleum (Fay) of Houston for Stanley Kennedy No. 9-11 2-27H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,115 ft., perf. 5,256-9,018 OA ft. Loc. SHL: 495 ft. FSL & 357 ft. FWL and BHL: 529 ft. FNL & 1,165 ft. FWL of Sec. 27-9N-11W. Workover done June 2.

CONWAY -- XTO Energy Inc. of Oklahoma City for Ward No. 3-35H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,110 ft., perf. 6,040-9,967 OA ft. Loc. SHL: 537 ft. FSL & 603 ft. FEL and BHL: 444 ft. FNL & 1,800 ft. FEL of Sec. 35-8N-17W. Workover done June 21.

WHITE -- BHP Billiton Petroleum (Fay) for Fowler No. 8-7 2-30H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,160 ft., perf. 5,443-9,045 OA ft. Loc. SHL: 1,400 ft. FSL & 528 ft. FEL and BHL: 516 ft. FNL & 1,630 ft. FWL of Sec. 30-8N-7W. Workover done June 7.

ABBREVIATIONS

Loc. -- location; Perf. -- perforations; FEL -- from the east line; FNL -- from the north line; FSL -- from the south line; FWL -- from the west line; FEUL -- from the east unit line; FWUL -- from the west unit line; FNUL -- from the north unit line; FSUL -- from the south unit line; MCF -- thousand cubic feet; bbl -- barrel; MD -- measured depth; TD -- total depth; TVD -- true vertical depth; PBTD -- plug back total depth; BHL -- bottom hole location; PBHL -- proposed bottom hole location; SHL -- surface hole location; OA -- overall; N/A -- not available.

SundayMonday Business on 07/10/2016

Upcoming Events